Collierville 8 Nov03
Home Up

See a video showing the creation of an AWS D1.1 Prequalified WPS.

weldingdata.com

 

Below are some pictures fron the park that was built in Collierville Tennessee. The ARC company ramps were nice but I'm sure for the money they could have gotten a much quieter concrete park. The park was shutdown shortly after these pics were taken(Nov 03) . Due to NOISE.

If you are trying to get a skatepark built, look into concrete construction.

P1010003.JPG (123233 bytes)   P1010004.JPG (126923 bytes)  P1010006.JPG (127583 bytes) P1010007.JPG (121413 bytes) P1010008.JPG (125230 bytes)

P1010009.JPG (123956 bytes) P1010012.JPG (119915 bytes) P1010014.JPG (130211 bytes) P1010015.JPG (118219 bytes) P1010016.JPG (123350 bytes) 

P1010018.JPG (121987 bytes) P1010019.JPG (119627 bytes) P1010021.JPG (113475 bytes) P1010022.JPG (120192 bytes) P1010024.JPG (108076 bytes)

P1010025.JPG (104393 bytes) P1010026.JPG (101120 bytes) P1010027.JPG (135625 bytes) P1010029.JPG (149169 bytes)

Hit Counter